Sandwich panel installation

Roof, wall, partition and ceiling sandwich panels with flashings and trims. Panel weathertightness depends on installation sequence and lap direction.

Depth

What we install

  • insulated wall panels;
  • partition and ceiling panels;
  • insulated roof panels;
  • flashings and trims.

Roof panels

Panels have side and end laps, so the installation sequence is what makes them weathertight:

  1. Start from the edge (lowest) corner panel with side and end laps facing the outside of the building.
  2. Lay further panels against the direction of fall so that each lap covers the panel below — up to the ridge or eaves.
  3. Start the second run from the eaves. Side laps cover the installed panels, are sealed and fixed.

Wall panels

Horizontal

Install from the bottom after checking that the frame, base flashing and brackets (centres up to 1.5 m) are in one plane. The top edge is fixed to the rail with one or two fasteners depending on panel size and wind load. The last top panel is fixed to the steel at no more than 500 mm centres.

Vertical

Check the bottom support rail is supported, fixed and level. The first panel goes groove-side to the corner, plumb. Joints are parallel and even over the full height; each rail gets the required number of fasteners.

Edge seals are factory-fitted. Where panels are cut at openings and corners, through-fixings are used and covered by flashings. Flashings and trims are fixed, aligned and sealed with straight, undamaged edges.

Not yet technically reviewed

Contact

Have a project or a roof that needs an assessment?

Send drawings, a bill of quantities or photos — a specialist reviews the documents and contacts you for an individual assessment.

Send your project+370 699 49475Mon–Fri 8:00–17:00PDF · DWG · DXF · IFC · XLSX · JPG
Send your project